Expected results

The main results related to this project are:

– Modular power generator in a pilot plant scale. Development of hydraulic co-generation pilot plant in water abduction and distribution network using a pressure reduction system that runs in parallel to the load-break boxes provided with sealing disc or the like, in which the reduction of pressure is performed by hydraulic turbine obtaining, together with an electric generator, a remnant energy.

– Generation of 700,000 KWh of electricity from the kinetic and potential energy of water that arrives to the rupture zone of Villandio. – Contributing to reduce GHG emissions. NO emission of 188.3 Ton of CO2 per year thanks to the use of green energy. (Spanish average: 0.269 kgCO2/kWh. Source: Energy Observatory for the month of August 2012).

– Contributing to reduce GHG emissions. NO annual emission of 403.2 Kg of SO2 thanks to the use of green energy. (Spanish average: 0.576 gSO2/kWh. Source: Energy Observatory for the month of August 2012).

– Contributing to reduce GHG emissions. NO annual emission of 284.9 Kg of NOx thanks to the use of green energy. (Spanish average: 0.407 gNOx/kWh. Source: Energy Observatory for the month of August 2012).